Skip to content

Fulham FC, new Putney stand

A fire alarm across the four floors of Fulham’s new stand. We designed and installed it, with a disabled refuge system and toilet assistance alarms.

Football stadiums Fire alarms

Points installed
103
Approximate timescale
2 months
Craven Cottage at night from above, beside the River Thames